Saturday 3 August 2013

Manual Testing Content

Software Testing Content

Software IT Industry Introduction               Software Testing  Introduction

Benefits of the Testing                                  Software Development Life Cycle Phases

Development life cycle models (or) process models

1. waterfall model                                          2.V –process Model

3. Iterative models Or Incremental Model 4. RAD ( Rapid Application Development ) model:

5. Spiral model                                             6.Agile Model or Extreme programming

Software Testing Methodologies

1.Static Testing                                          2.Dynamic Testing

1.Static Testing                                           Informal Reviews

( Peer Review )                                           Technical  Review

Lead Reviews                                              Management Review

Formal  Review                                           ( Inspections & Audits )

Walk Through

Approaches or  Methodologies of  Dynamic Testing

White Box Testing                                            Black Box Testing

 Gray Box Testing                                           1) White Box Testing     Or    Structural Testing

 A)Unit Testing:                                               B)Integration Testing:

 Black Box Testing   Or Specification Based Testing

 A) System Testing:                                         B) Acceptance Testing:

 Testing Terminologies:

 Project:                                                              Product:

Vendor:                                                             Client:

Customer:                                                         Templates:

Report                                                              1) Status Report

B) Daily Status Report                                    2) Defect Reports:

Clarification Document (RCN):                     Knowledge Transfer(Kt):

Sme (Subject Matter Expert):                          Build:

Deployment:                                                    Deliverable:

SRN ( Software Release Note ) :                     DD ( Deployment Document ):

 Installation Document:                                    Unit Test Report:

 Test Set:                                                           Test Cycle:

 Issue Log:                                                        Test Execution:

Traceability Matrix:                                         White Box Testing Techniques

 Statement Coverage                                        Path /Branch/Condition Coverage

 2.Black Box Testing                                        Testing Life Cycle Process Implementation

 As Part Of That The First Activity Performed is :

 Requirements Analysis                                     Benefits Of Requirements Study

 Black Box Testing                                            Test Design Techniques

 Boundary Value Analysis(BVA)                       Equivalence Class Partitioning(ECP):

 State Transition Testing                                    Decision Table Testing

 Use case Based Testing:

Software Testing Life Cycle

Test Planning :                                                  Test Analysis :

Test Design :                                                     Test Execution

Test Closure :                                                    Environments

Architecture There Are Different Architecture:

A) One Tier Architecture:                             B) Two Tier Architecture:

C) Three Tier Architecture:                          D) N-Tier Architecture:

1) Production Environment:                         2) Development Environment:

3) Test Environment :                                    Deployment:

Deployment For Desktop/Client-Server Based Applications:

Deployment For Web Based Applications:

Test Environment Set Up:

Test Set:

Test Plan:

Contents of Test Plan:

Test Analysis and Implementation manual Process

BRS (Business Requirements Specifications)

 SRS (Software Requirement Specifications)

 FRS (Functional Requirement Specifications)

 Test Scenario Template                               Test Case Preparation

 Qualities Of Good Test Case:                       Fields in Test Case Template:

 Test Case Description:                                  Step Name:

 Step Description:                                           Test Data:

 Expected Result:                                           Priority:

 Review Comments:                                      Types of System Tastings

 Smoke Testing                                               Sanity Testing :

 Patch                                                              Formal Testing :

 Retesting :                                                     Regression Testing :

 Informal Testing Or Adhock Testing :        Special Testing Tags In Functional System Testing           Exploratory Testing

 Error Guessing :                                           Mutation Testing :

 Monkey Testing ( Or ) Rattle Testing :       End To End Testing :

 Non Functional System Testing Types :

 UI Testing :                                                   Check List For UI Testing   :

 Usability Testing :                                          Security Testing :

 Check List For Security Testing   :              Check For Access Control (Authorization ) :

 Check For Authentication :                           Performance Testing :

 Compatibility Testing :                                  Recovery Testing :

 Installation Testing :                                     Un installation Testing :

 Globalization Testing :                                  Localization Testing :

                                         Functional Testing:

 1. Behavioral / GUI:                                     2. Input Domain:

3. Error Handling:                                         4. Manipulations:

5. Database Validity:                                      6. Sanitation:

Defect Life Cycle

New->Open->Fixed,Resolved->Closed

New->Rejected

New->Hold

New->Open->Fixed->Reopen->Fixed

New->Duplicate

New->Differed

Defect Reporting

Prepare Defect Report                                  Reproducible

Different Defect Severities                           Different Defect Priorities:

Data Base Testing                                         Necessity Of DB Testing

Software Configuration Management Tools

Common Repository :                                     Software Configuration Management :

Benefits Of Common Repository :                 Test Management

1) Requirement Management :                        2) Change Management :

3) Version Controlling :                                   4) Test Planning

5) Risk And Mitigation Planning :                  6) Defect Management

Traceability Matrix

 Traceability  :

 Traceability Matrix Template

Advantages Of Traceability Matrix :

Others

Resume Preparation

                 Mock Interview

                 Personal Round

                 Technical Interview

                 Manager Round

                 HR round

1 comment:

  1. I am really very happy to visit your blog. Directly I am found which I truly need. please visit our website for more information
    Quality Engineering Services

    ReplyDelete