Showing posts with label Maintain and update test plans. Show all posts
Showing posts with label Maintain and update test plans. Show all posts

Thursday, 16 February 2017

What will be done after a defect/bug is found in project/application?

The bug has to be communicated and assigned to developers which will fix it.
when the matter is resolved, fixes ought to be re-tested, and determinations created concerning needs for regression testing to examine that fixes did not produce issues elsewhere.
If a problem-tracking system is in repository, it ought to encapsulate these processes.
A range of business problem-tracking/management software system tools square measure offered (see the 'Tools' section for net resources with listings of such tools).
the subsequent square measure things to contemplate within the chase process:
•         Complete info specified developers will perceive the bug, get a plan of its severity, and reproduce it if necessary.
•         Bug symbol (number, ID, etc.)
•         Current bug standing (e.g., 'Released for Retest', 'New', etc.)
•         The application name or symbol and version
•         The perform, module, feature, object, screen, etc. wherever the bug occurred
•         Environment specifics, system, platform, relevant hardware specifics
•         Test case name/number/identifier
•         One-line bug description
•         Full bug description
•         Description of steps required to breed the bug if not coated by an action or if the developer does not have quick access to the check case/test script/test tool
•         Names and/or descriptions of file/data/messages/etc. utilized in check
•         File excerpts/error messages/log file excerpts/screenshots/test tool logs that may be useful to find the explanation for the matter
•         Severity estimate (a 5-level vary like 1-5 or 'critical'-to-'low' is common)
•         Was the bug reproducible?
•         Tester name
•         Test date
•         Bug reportage date
•         Name of developer/group/organization the matter is assigned to
•         Description of downside cause
•         Description of fix
•         Code section/file/module/class/method that was fixed
•         Date of fix
•         Application version that contains the fix
•         Tester responsible for retest
•         Retest date
•         Retest results
•         Regression testing requirements
•         Tester responsible for regression tests
•         Regression testing results
•         A reporting or tracking process should enable notification of appropriate personnel at various stages.
•         For instance, testers need to know when retesting is needed, developers need to know when bugs are found and how to get the needed information, and reporting/summary capabilities are needed for managers.